Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hydro-electric power development at high falls
Net head of 80 ft. utilized at power site on Miss. River by Hydro-Electric Power Commission of Ontario. Details of dam, intake, gate house, pipe line and power house. Surface area method of proportioning materials said to show excellent results in construction of concrete dam.
Hydro-electric power development at high falls
Net head of 80 ft. utilized at power site on Miss. River by Hydro-Electric Power Commission of Ontario. Details of dam, intake, gate house, pipe line and power house. Surface area method of proportioning materials said to show excellent results in construction of concrete dam.
Hydro-electric power development at high falls
Can. Engr
Canadian Engineer ; 37
1919
4 pages
15 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Twin falls hydro-electric development
Engineering Index Backfile | 1936
|Mclaren falls hydro-electric power scheme
Engineering Index Backfile | 1929
|Island falls hydro power development
Engineering Index Backfile | 1929
|Hydro development at Hemmings Falls
Engineering Index Backfile | 1927
Ontario hydro project at Niagara Falls
Engineering Index Backfile | 1953
|