Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Anchor pins of Cornwall cantilever bridge bored out and renewed
Repair work of steel bridge involved boring out of worn and weak pins and replacing them with new pins of larger diameter. It is said work was accomplished without use of supporting falsework under bridge and with practically no interruption to traffic.
Anchor pins of Cornwall cantilever bridge bored out and renewed
Repair work of steel bridge involved boring out of worn and weak pins and replacing them with new pins of larger diameter. It is said work was accomplished without use of supporting falsework under bridge and with practically no interruption to traffic.
Anchor pins of Cornwall cantilever bridge bored out and renewed
Eng. News-Rec
Welty, H.T. (Autor:in)
1920
4 pages
8 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Stainless steel hinge pins anchor bridge retrofit
British Library Online Contents | 1993
|Lower Bridge, Boscastle, Cornwall
Online Contents | 2009
Lower Bridge, Boscastle, Cornwall
British Library Online Contents | 2009
CANTILEVER BORED PILES IN SOFT CLAY: STRUCTURAL STIFFNESS AND DISPLACEMENT
British Library Conference Proceedings | 1999
|