Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Renewal of summerhill bridge, Dublin, with reinforced concrete
Description of reconstruction of an old bridge with reinforced concrete. Old bridge was moved half at a time, and new reinforced concrete work, consisting of pre-cast sections, was constructed in 17 hr.
Renewal of summerhill bridge, Dublin, with reinforced concrete
Description of reconstruction of an old bridge with reinforced concrete. Old bridge was moved half at a time, and new reinforced concrete work, consisting of pre-cast sections, was constructed in 17 hr.
Renewal of summerhill bridge, Dublin, with reinforced concrete
Concrete
Concrete ; 15
1920
3 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Renewal of bridge in reinforced concrete
Engineering Index Backfile | 1952
|Newcastle upon Tyne: Sanierungsgebiet Summerhill Central, Abschnitt 1
Online Contents | 1975
|The State and Urban Renewal: Lessons from Dublin
British Library Conference Proceedings | 1995
|Engineering Index Backfile | 1934
|