Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Kenova bridge intermediate spans
Describes erection of two 298-ft. spans outside of old spans in service and the replacing of three remaining spans by cantilever method, using new end spans for anchorage. It is claimed that methods and plant used are suitable for consideration for replacement of long span municipal bridges.
Kenova bridge intermediate spans
Describes erection of two 298-ft. spans outside of old spans in service and the replacing of three remaining spans by cantilever method, using new end spans for anchorage. It is claimed that methods and plant used are suitable for consideration for replacement of long span municipal bridges.
Kenova bridge intermediate spans
Public Works
Public Works ; 48
1920
3 pages
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Handling complete bridge spans
Engineering Index Backfile | 1909
Merchants Bridge spans history
British Library Online Contents | 1995
|Engineering Index Backfile | 1942
Engineering Index Backfile | 1942
Prestressed bridge spans Argyle cut
Engineering Index Backfile | 1957