Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Susquehanna water supply project
Project consists of 38 mi long aqueduct from Conowingo Power Pool on Susquehanna River to existing Montebello Filtration Plant in northern suburbs of Baltimore; new source of 250 mgd of raw water will supplement existing sources on Gunpowder and Patapsco Rivers; aqueduct consists of about 35 mi of pipe line in open cut and about 3 mi of tunnel in rock; intake is of shore type located just above hydroelectric dam with short section of tunnel around abutment; 3 mi section of 9 ft rock tunnel establishes minimum pumping head.
Susquehanna water supply project
Project consists of 38 mi long aqueduct from Conowingo Power Pool on Susquehanna River to existing Montebello Filtration Plant in northern suburbs of Baltimore; new source of 250 mgd of raw water will supplement existing sources on Gunpowder and Patapsco Rivers; aqueduct consists of about 35 mi of pipe line in open cut and about 3 mi of tunnel in rock; intake is of shore type located just above hydroelectric dam with short section of tunnel around abutment; 3 mi section of 9 ft rock tunnel establishes minimum pumping head.
Susquehanna water supply project
ASCE Transportation Eng Conference -- Preprint
Vollmer, A.R. (Autor:in) / Regnier, R.C. (Autor:in)
ASCE Transportation Engineering Conference ; 1965
1965
19 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Susquehanna Project for Baltimore
Wiley | 1959
|British Library Conference Proceedings | 2011
|Navigation canals on the Susquehanna
Engineering Index Backfile | 1928
|Conowingo power plant, Susquehanna river
Engineering Index Backfile | 1928