Tests of 824 m long tunnel at Stuttgart, West Germany are described; fresh air was introduced into tunnel from both sides of track, it flowed to track center and from there passed upwards; exhaust air is removed by suction through apertures in roof; tests led to conclusion that elimination of air pollutants from tunnel was insufficient; further flow tests showed that by changing direction of ventilation downward from above, better ventilation is achieved. (n 8 Aug 1965 p 301-6)
Tests of 824 m long tunnel at Stuttgart, West Germany are described; fresh air was introduced into tunnel from both sides of track, it flowed to track center and from there passed upwards; exhaust air is removed by suction through apertures in roof; tests led to conclusion that elimination of air pollutants from tunnel was insufficient; further flow tests showed that by changing direction of ventilation downward from above, better ventilation is achieved. (n 8 Aug 1965 p 301-6)
Flow tests in vehicular tunnel
Stroemungsversuche in einem Autotunnel
Baum, F. (Autor:in)
Staub ; 25
1965
4 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1942
|Ventilating Lincoln vehicular tunnel
Engineering Index Backfile | 1939
|World's largest vehicular tunnel
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1923
Engineering Index Backfile | 1920
|