Pedestrian subways pipe thrust under A10 Great Cambridge Road
Pipe jacking technique adopted consists of excavation of thrust pit steel shield driven into face, concrete tube section butted on to shield, soil excavated from within shield and pipe and shield driven forward by hydraulic rams acting on rear edge of concrete section; pipes used are doubly reinforced concrete sections 10 ft 3 in. ID and 5 ft long with 9 in. wall thickness; outside guard joints bed on two rings of hemp and water seal is achieved by using Cornelius rubber ring system.
Pedestrian subways pipe thrust under A10 Great Cambridge Road
Pipe jacking technique adopted consists of excavation of thrust pit steel shield driven into face, concrete tube section butted on to shield, soil excavated from within shield and pipe and shield driven forward by hydraulic rams acting on rear edge of concrete section; pipes used are doubly reinforced concrete sections 10 ft 3 in. ID and 5 ft long with 9 in. wall thickness; outside guard joints bed on two rings of hemp and water seal is achieved by using Cornelius rubber ring system.
Pedestrian subways pipe thrust under A10 Great Cambridge Road
Surveyor
Surveyor ; 126
1965
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
Pedestrian Subways in Urban Areas with Special Reference to Delhi
British Library Online Contents | 1999
|Engineering Index Backfile | 1908
Engineering Index Backfile | 1952
|Engineering Index Backfile | 1938