Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Description of recently completed additions to Sheffield Corporation Waterworks, which cost 1,760,000 pounds sterling and includes Broomhead earth-fill dam, 104-ft. high, with concrete cut-off walls of 120 ft. average depth; More Hall earth-fill dam 80 ft. high, with concrete cut-off wall to depth of 80 ft.; pressure filtration plant of 7,000,000 gal. per day ultimate capacity, etc.
Description of recently completed additions to Sheffield Corporation Waterworks, which cost 1,760,000 pounds sterling and includes Broomhead earth-fill dam, 104-ft. high, with concrete cut-off walls of 120 ft. average depth; More Hall earth-fill dam 80 ft. high, with concrete cut-off wall to depth of 80 ft.; pressure filtration plant of 7,000,000 gal. per day ultimate capacity, etc.
Ewden valley reservoirs and works
Water Water Eng
Terrey, W. (Autor:in)
1929
5 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Ewden valley reservoirs and works
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1916
|Wiley | 1916
|Engineering Index Backfile | 1913
|The Washburn Valley reservoirs - spillway improvements
British Library Conference Proceedings | 2004
|