Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A well-managed cast iron water main job
Handling of pipe on jobs in Greenwich, Conn., and Port Chester, N. Y.; trenching; unloading pipe; joints calked pneumatically; lines tested with air.
A well-managed cast iron water main job
Handling of pipe on jobs in Greenwich, Conn., and Port Chester, N. Y.; trenching; unloading pipe; joints calked pneumatically; lines tested with air.
A well-managed cast iron water main job
Contractors Engrs. Monthly
1929
3 pages
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Century Old Cast Iron Water Main
Wiley | 1931
|CORROSION AND CAST‐IRON MAIN BREAKS
Wiley | 1969
|Phorgotten Phenomena: Longevity of a Graphitized Cast Iron Water Main
British Library Online Contents | 2007
|Addendum to Cast‐Iron Main Installation Standards
Wiley | 1955
Applying artificial neural networks to predict cast iron water main breaks
British Library Conference Proceedings | 2000
|