Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tunneling under mountains and rivers -- Roman engineers took years to do what modern engineers could accomplish in eleven months
General notes on tunnels; 3.5-mi. tunnel to drain Lake Nemi, in Italy, completed in A. D. 52 after 11 years of work of 30,000 men; fire method was still used to break rock in 1621; brief data on Holland vehicular tunnel connecting New York and Jersey City. (on p. 68)
Tunneling under mountains and rivers -- Roman engineers took years to do what modern engineers could accomplish in eleven months
General notes on tunnels; 3.5-mi. tunnel to drain Lake Nemi, in Italy, completed in A. D. 52 after 11 years of work of 30,000 men; fire method was still used to break rock in 1621; brief data on Holland vehicular tunnel connecting New York and Jersey City. (on p. 68)
Tunneling under mountains and rivers -- Roman engineers took years to do what modern engineers could accomplish in eleven months
Oil Power
Oil-Power ; 4
1929
4 pages
4 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
HOW ROMAN ENGINEERS COULD HAVE FLOODED THE COLOSSEUM
British Library Online Contents | 2007
|Wiley | 2011
|Board of Engineers for Rivers and Harbors
NTIS | 1989
Engineering Index Backfile | 1885
How Roman engineers selected their water supplies
Online Contents | 2007
|