Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Difficult rush-work winter project in business center of city completed in record time with little interruption to traffic; rich, early-strength concrete used; costs and construction details.
Difficult rush-work winter project in business center of city completed in record time with little interruption to traffic; rich, early-strength concrete used; costs and construction details.
Paving of third avenue, Seattle
West. Construction News
Moore, G.H. (Autor:in)
1929
3 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Alki avenue seawall, Seattle, Washington
Engineering Index Backfile | 1930
|Fourteenth avenue south bridge, Seattle
Engineering Index Backfile | 1931
|Fifth avenue retaining wall; Oregon and Washington, Seattle, Wsh
Engineering Index Backfile | 1910