Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Experiences in Westfield, N. J.; cause of overloading of sewers; infiltration not main cause; survey of leader connections; misuse of sewers by builders; during periods of storm, after ground had time to saturate, flow may increase to ten times normal; analyzing abnormal flow; results of flooding of sewage systems. Paper read before N. J. Sewage Works Assn. (See also Mun. News vol. 76, no. 5, May 1929 pp. 205-206)
Experiences in Westfield, N. J.; cause of overloading of sewers; infiltration not main cause; survey of leader connections; misuse of sewers by builders; during periods of storm, after ground had time to saturate, flow may increase to ten times normal; analyzing abnormal flow; results of flooding of sewage systems. Paper read before N. J. Sewage Works Assn. (See also Mun. News vol. 76, no. 5, May 1929 pp. 205-206)
The overloading of sanitary sewers
Pub. Works
Blair, A. (Autor:in)
Public Works ; 60
1929
2 pages
1 Fig.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The overloading of sanitary sewers
Engineering Index Backfile | 1929
|Overloading of sewers: some corrective measures and contemplated improvements
Engineering Index Backfile | 1985
|Design and construction of sanitary sewers
Engineering Index Backfile | 1932
|Sanitary Sewers: State-of-the-Practice
British Library Conference Proceedings | 1997
|