Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Gantries applied in three ways to build 4-mile outfall sewer
Equipment and methods of construction of Akron outfall sewer of brick and concrete, on concrete pile foundation.
Gantries applied in three ways to build 4-mile outfall sewer
Equipment and methods of construction of Akron outfall sewer of brick and concrete, on concrete pile foundation.
Gantries applied in three ways to build 4-mile outfall sewer
Construction Methods
Construction Methods ; 11
1929
4 pages
12 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Three-mile outfall sewer laid below harbor bottom
Engineering Index Backfile | 1929
Engineering Index Backfile | 1940
|Engineering Index Backfile | 1914
|Manchester, Mass., outfall sewer
Engineering Index Backfile | 1917
|Engineering Index Backfile | 1947
|