Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
1,700 feet of 18-foot bituminous macadam a day
Brief description of excavation and paving operations on 8-mile road between Hartford and Grenville, New York; pavement consists of base course 9 in. thick, between course made entirely of number four stone-filled crushed screenings, top course of number three stone colled to thickness of 3 in. and seal coat of bituminous material.
1,700 feet of 18-foot bituminous macadam a day
Brief description of excavation and paving operations on 8-mile road between Hartford and Grenville, New York; pavement consists of base course 9 in. thick, between course made entirely of number four stone-filled crushed screenings, top course of number three stone colled to thickness of 3 in. and seal coat of bituminous material.
1,700 feet of 18-foot bituminous macadam a day
Contractors Engrs. Monthly
1929
3 pages
11 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1902
Bituminous macadam and bituminous concrete
Engineering Index Backfile | 1913
|Engineering Index Backfile | 1902
|Bituminous macadam construction
Engineering Index Backfile | 1912
|Engineering Index Backfile | 1903
|