Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Paving outfit organized for 125 feet per hour
Construction operations on 16.5 mi. concrete road from Raymond to Utica, Miss.
Paving outfit organized for 125 feet per hour
Construction operations on 16.5 mi. concrete road from Raymond to Utica, Miss.
Paving outfit organized for 125 feet per hour
Contractors Engrs. Monthly
1929
3 pages
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1994
Online Contents | 1998
Online Contents | 2004
Multiple-lane paving job organized for fast work
Engineering Index Backfile | 1929
|Online Contents | 1994