Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Heavy construction on sunset highway in Washington
Exceptionally heavy rock grading and interesting use of coyote hold work in blasting is described; equipment problems are considered in detail; summary of quantities of materials necessary.
Heavy construction on sunset highway in Washington
Exceptionally heavy rock grading and interesting use of coyote hold work in blasting is described; equipment problems are considered in detail; summary of quantities of materials necessary.
Heavy construction on sunset highway in Washington
Highway Engr. Contractor
Scott, W.A. (Autor:in)
1929
5 pages
8 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
TIBKAT | 119.1976 - 134.1991
Washington Highway has heavy grading for viaduct
Engineering Index Backfile | 1929
|Washington State's Highway Capital Construction Programming Process
British Library Online Contents | 1997
|Washington State's Highway Capital Construction Programming Process
British Library Conference Proceedings | 1997
|