Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A 24-foot highway through heavy redwood timber
Construction of 15-mi. road surfaced with crushed gravel from Orick, Humboldt County, Calif., to Del Norte county line; methods and itemized costs of clearing, grading, and surfacing. From article in Calif. Highways and Pub. Works.
A 24-foot highway through heavy redwood timber
Construction of 15-mi. road surfaced with crushed gravel from Orick, Humboldt County, Calif., to Del Norte county line; methods and itemized costs of clearing, grading, and surfacing. From article in Calif. Highways and Pub. Works.
A 24-foot highway through heavy redwood timber
Contractors Engrs. Monthly
Hubbs, M.H. (Autor:in)
1929
2 pages
4 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1946
|Channelization on redwood highway at entrance to Hamilton field
Engineering Index Backfile | 1945
|TIBKAT | 1972
Curves and flood hazards eliminated by relocation on Redwood highway
Engineering Index Backfile | 1943
|British Library Online Contents | 2000
|