Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Details of regrading, widening and paving of 4.67 mi. section of Pacific highway between Canemah and New Era, Ore., which cost $251,000; heavy cuts; rubble masonry wall; concrete paving; central-crushing and screening plant.
Details of regrading, widening and paving of 4.67 mi. section of Pacific highway between Canemah and New Era, Ore., which cost $251,000; heavy cuts; rubble masonry wall; concrete paving; central-crushing and screening plant.
Regrading and paving Pacific Highway
Highway Engr. Contractor
Scott, W.A. (Autor:in)
1929
4 pages
10 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Paving Pennsylvania's straightest highway
Engineering Index Backfile | 1948
Preparing the groundwork for a city; the regrading of Seattle, Washington
Engineering Index Backfile | 1927
|General highway conditions and paving
Engineering Index Backfile | 1928