Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods used in design and construction of 53 m. by 33 m. by 24 m. high building and details of reinforced-concrete foundation; concreting of basement below ground-water level; erection of steel roof trusses 32 m. in span; pumice-concrete tiles used for covering roof.
Methods used in design and construction of 53 m. by 33 m. by 24 m. high building and details of reinforced-concrete foundation; concreting of basement below ground-water level; erection of steel roof trusses 32 m. in span; pumice-concrete tiles used for covering roof.
Magdeburg City Hall
Konstruktion und Ausfuehrung der Stadthalle in Magdeburg
Wedemeyer, A. (Autor:in)
Deutsche Bauzeitung ; 63
1929
5 pages
9 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
DataCite | 1930
|DataCite | 1928
|UB Braunschweig | 1966
|