Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of 29-story office building which will cost in excess of $3,000,000; basement excavation; foundation studies; caisson localities and log of borings; concreting foundation; structural steel erection; terra cotta and finishing.
Construction of 29-story office building which will cost in excess of $3,000,000; basement excavation; foundation studies; caisson localities and log of borings; concreting foundation; structural steel erection; terra cotta and finishing.
Shell building, San Francisco
West. Construction News
Darwin, A.G. (Autor:in)
1929
5 pages
8 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2005
|SAN FRANCISCO FEDERAL BUILDING - Morphosis
Online Contents | 2004
The spreckels building, San Francisco
Engineering Index Backfile | 1898
SAN FRANCISCO FEDERAL BUILDING Morphosis
British Library Online Contents | 2004
The Phelan building, San Francisco
Engineering Index Backfile | 1908