Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Material handling on the new dominion square building in Montreal
Methods of construction practice and erection of 10-story steel-frame building occupying area of 238 ft. by 170 ft. and having also 5 stories below grounds; job is noted for speed of excavation and winter concreting.
Material handling on the new dominion square building in Montreal
Methods of construction practice and erection of 10-story steel-frame building occupying area of 238 ft. by 170 ft. and having also 5 stories below grounds; job is noted for speed of excavation and winter concreting.
Material handling on the new dominion square building in Montreal
Contractors Engrs. Monthly
Bone, A.E. (Autor:in)
1929
4 pages
10 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Mechanical equipment of the dominion square building
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1929
Comparator building of the dominion land survey
Engineering Index Backfile | 1914
Green Building. Ecoresidence, Montreal
British Library Online Contents | 1999
|Online Contents | 1998
|