Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New office buildings of north German woolen mill in Bremen
Design and construction of reinforced-concrete 7-story building, occupying area of approximately 80 by 70 m.; having interior court with basement extending under its entire area; structural details; method of groundwater control in foundations; total cost of construction was 154,000 marks.
New office buildings of north German woolen mill in Bremen
Design and construction of reinforced-concrete 7-story building, occupying area of approximately 80 by 70 m.; having interior court with basement extending under its entire area; structural details; method of groundwater control in foundations; total cost of construction was 154,000 marks.
New office buildings of north German woolen mill in Bremen
Das neue Verwaltungsgebaeude der Norddeutschen Wollkaemmerei und Kammgarnspinnerei in Bremen
Bernhard, K. (Autor:in)
Beton und Eisen ; 28
1929
7 pages
28 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
To sunny Algiers with the North German Lloyd Bremen
UB Braunschweig | 1910
|Nervi’s Isostatic Lines’ Inspired Floor Slabs. Beyond the Archetypal Gatti Woolen Mill in Rome
Springer Verlag | 2023
|Reconstruction of North-German Lloyd, Bremen, from 1919 to 1930
Engineering Index Backfile | 1930
|A pilot scale anoxic-oxic membrane bioreactor (A-O MBR) for woolen mill dyeing wastewater treatment
Online Contents | 2003
|