Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Scheme for utilization of Amu-Darya river, etc
Project, worked out by Amu-Darya Bureau, for diversion and storage system to irrigate 4,000,000 hectares, capable of producing 60,000, 000 poods of cotton per annum; construction of project estimated to cost nearly 1 1/2 billion rubles. (In Russian.)
Scheme for utilization of Amu-Darya river, etc
Project, worked out by Amu-Darya Bureau, for diversion and storage system to irrigate 4,000,000 hectares, capable of producing 60,000, 000 poods of cotton per annum; construction of project estimated to cost nearly 1 1/2 billion rubles. (In Russian.)
Scheme for utilization of Amu-Darya river, etc
Vestnik Irrigatziyi
Vassilyev, V. (Autor:in)
1929
8 pages
1 Fig.
Aufsatz (Zeitschrift)
Russisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Improved dam operation in the Amu Darya river basin including transboundary aspects
British Library Conference Proceedings | 2006
|Calculating the Benefits of Transboundary River Basin Cooperation: Syr Darya Basin
Online Contents | 2011
|Calculating the Benefits of Transboundary River Basin Cooperation: Syr Darya Basin
British Library Online Contents | 2011
|Five decades of freshwater salinization in the Amu Darya River basin
Elsevier | 2023
|