Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Driving piling for foundations of Canadian Government elevator under construction at Prescott, Ont.; over 5560 pieces of sheet piling and 18,290 round piles, ranging from 30 ft. to 65 ft., were used.
Government elevator at Prescott, Ont
Can. Engr
Smith, E. (Autor:in)
Canadian Engineer ; 58
1930
4 pages
6 figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Highway and track work at prescott
Engineering Index Backfile | 1931
|Prescott launches latest planning policy
British Library Online Contents | 2004
NEWS - Prescott refutes Select Committee criticisms
Online Contents | 1999
NEWS - Prescott launches latest planning policy
Online Contents | 2004
Ground Water Recharge Project, Prescott Valley, Arizona
British Library Conference Proceedings | 1998
|