Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Over-driven piles, Brooklyn fourth avenue subway construction
Illustrates and describes the methods of construction and the condition of the piles. (800 w.) (No. 21303)
Over-driven piles, Brooklyn fourth avenue subway construction
Illustrates and describes the methods of construction and the condition of the piles. (800 w.) (No. 21303)
Over-driven piles, Brooklyn fourth avenue subway construction
Eng News
Brown, S.P. (Autor:in)
1911
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Excavation methods, fourth Avenue Subway, Brooklyn
Engineering Index Backfile | 1910
Construction of a portion of the fourth avenue subway, Brooklyn
Engineering Index Backfile | 1910
Concrete work on the fourth avenue subway
Engineering Index Backfile | 1912
|Engineering Index Backfile | 1921
Engineering Index Backfile | 1920