Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bypassing difficult sewer construction job
Details of job carried out in City of Carlsbad, NM; construction of deep section of interceptor proving difficult, this section was replaced by sewer laid at higher level and sewage pumped into it.
Bypassing difficult sewer construction job
Details of job carried out in City of Carlsbad, NM; construction of deep section of interceptor proving difficult, this section was replaced by sewer laid at higher level and sewage pumped into it.
Bypassing difficult sewer construction job
Pub Works
Roberts, E.A. (Autor:in)
Public Works ; 75
1944
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2010
Difficult sewer construction in Minneapolis
Engineering Index Backfile | 1905
Difficult construction of concrete sewer
Engineering Index Backfile | 1910
|Difficult sewer construction in Minneapolis
Engineering Index Backfile | 1905
Sewer construction in difficult ground
Engineering Index Backfile | 1950
|