Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Under direction of U S Army Engineers, soldiers clear and grade, ditch, drain, handle stock piles, pour concrete, install and operate sewer and water systems and finish buildings in sub-zero weather; manner in which work was accomplished.
Under direction of U S Army Engineers, soldiers clear and grade, ditch, drain, handle stock piles, pour concrete, install and operate sewer and water systems and finish buildings in sub-zero weather; manner in which work was accomplished.
Construction methods in Sub-Arctic
Pac Bldr Engr
Merritt, A. (Autor:in)
1944
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1962
|Arctic Construction Problems and Techniques
ASCE | 2021
|Arctic construction problems and techniques
Engineering Index Backfile | 1968
|Arctic and subarctic construction : general provisions
TIBKAT | 1986
|Envelope Foundation Employment in Arctic Construction
ASCE | 2012
|