Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
City of Tacoma's Nisqually power project
Description of methods used on Tacoma's Nisqually project; 90,000-kva is being added to capacity of its municipally owned pool of hydroelectric power plants; Alder dam is one of longest concrete arch dams built to date; layout and equipment of aggregate and concreting plants feature of job; design and construction of Nisqually tunnel.
City of Tacoma's Nisqually power project
Description of methods used on Tacoma's Nisqually project; 90,000-kva is being added to capacity of its municipally owned pool of hydroelectric power plants; Alder dam is one of longest concrete arch dams built to date; layout and equipment of aggregate and concreting plants feature of job; design and construction of Nisqually tunnel.
City of Tacoma's Nisqually power project
Pac Bldr Engr
1944
8 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Nisqually project -- Northwest power to be supplemented
Engineering Index Backfile | 1944
Automating the Nisqually Project: Tacoma Power's Upgrade Experience
British Library Online Contents | 2007
|Tacoma's Water Works Construction Program
Wiley | 1939
|2001 Nisqually Earthquake: Lessons Learned by the City of Seattle
British Library Conference Proceedings | 2002
|Operating with New Ramping Rates at Tacoma Power's Nisqually Project
British Library Conference Proceedings | 2000
|