Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Important flood control project concluded successfully with help of diesel equipment
Details of Rubio Canyon Project, part of county-wide plan inaugurated by Los Angeles County, Calif, which is designed to protect lives and property from water and debris sweeping down from adjoining mountain sides when there are excessive rainfalls; Diesel powered earthworking equipment was used extensively in process of construction of dams, spillways and earthworks.
Important flood control project concluded successfully with help of diesel equipment
Details of Rubio Canyon Project, part of county-wide plan inaugurated by Los Angeles County, Calif, which is designed to protect lives and property from water and debris sweeping down from adjoining mountain sides when there are excessive rainfalls; Diesel powered earthworking equipment was used extensively in process of construction of dams, spillways and earthworks.
Important flood control project concluded successfully with help of diesel equipment
Diesel Power
Pugh, M.D. (Autor:in)
Diesel Power ; 22
1944
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
MOMAF (Korea): Inter-Korean Shipping Agreement successfully concluded
British Library Online Contents | 2004
Important target flood discharge mechanism for civil engineering flood control project
Europäisches Patentamt | 2022
|Intelligent flood control equipment for water conservancy project
Europäisches Patentamt | 2022
|