Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Highway bridge repaired under traffic
Methods of repair used by Arkansas State Highway Dept on 2-span, through truss, all riveted bridge constructed in 1926 over Fourche Creek on Route 65 at south edge of city of Little Rock.
Highway bridge repaired under traffic
Methods of repair used by Arkansas State Highway Dept on 2-span, through truss, all riveted bridge constructed in 1926 over Fourche Creek on Route 65 at south edge of city of Little Rock.
Highway bridge repaired under traffic
Eng News-Rec
Engineering News-Record ; 132
1944
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Electrochemical Parameters of Repaired and Non-Repaired Concrete at Gimsoeystraumen Bridge
British Library Conference Proceedings | 1997
|Study on the Durability of Highway Bridge under Heavy Traffic
Trans Tech Publications | 2013
|Toll bridge influence on highway traffic operation
Engineering Index Backfile | 1947
|Estimating extreme highway bridge traffic load effects
British Library Conference Proceedings | 2010
|