Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
228 Transmission towers built and erected in 75 working days
Methods employed in erection of towers for 132,000-volt double circuit 27-mile tower line erected by Pub. Service Co. of Northern Illinois.
228 Transmission towers built and erected in 75 working days
Methods employed in erection of towers for 132,000-volt double circuit 27-mile tower line erected by Pub. Service Co. of Northern Illinois.
228 Transmission towers built and erected in 75 working days
Elec. News
Scribner, H.A. (Autor:in)
Electrical News ; 33
1924
2 pages
4 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Suspension-bridge towers erected with guy derrick
Engineering Index Backfile | 1935
Eight floors erected in mine days
Engineering Index Backfile | 1930
|Prestressed precast bridge deck erected in eight days
Engineering Index Backfile | 1957
|DataCite | 2024
|