Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge construction at Newcastle
Illustrated description of the foundation work of the Miramichi River highway bridge, built on two abutments and five piers over 1400 ft. channel. (1800 w.) (No. 47833)
Bridge construction at Newcastle
Illustrated description of the foundation work of the Miramichi River highway bridge, built on two abutments and five piers over 1400 ft. channel. (1800 w.) (No. 47833)
Bridge construction at Newcastle
Can Engr
Wentworth, N.B.C.A. (Autor:in)
1913
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
Engineering Index Backfile | 1928
British Library Online Contents | 2013
|Engineering Index Backfile | 1930
|Engineering Index Backfile | 1927