Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of large winter shelter for Toronto, Ont planetarium is described; plastic dome was built over project to make it possible to work in winter; dome is 125 ft in diam and 100 ft high; boarding protects planetarium's dome while gunite is applied; eight timber bents, cross-braced, bolted and tied, support long-span metal joists, which carry polyethylene roofing; curved formwork for dome was built at same time as 100-ft-high housing.
Construction of large winter shelter for Toronto, Ont planetarium is described; plastic dome was built over project to make it possible to work in winter; dome is 125 ft in diam and 100 ft high; boarding protects planetarium's dome while gunite is applied; eight timber bents, cross-braced, bolted and tied, support long-span metal joists, which carry polyethylene roofing; curved formwork for dome was built at same time as 100-ft-high housing.
Plastic housing reaches 100 ft into air
Eng Contract Rec
Salmins, G. (Autor:in)
1968
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Energy-efficient new housing - the UK reaches for sustainability
Online Contents | 2007
|Energy-efficient new housing - the UK reaches for sustainability
British Library Online Contents | 2007
|A Norwegian housing project reaches back to the 1970s music scene for inspiration
British Library Online Contents | 2006
|Online Contents | 2013
IuD Bahn | 2007
|