Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction methods on a triple sewer with a cross-section of 800 sq. ft., by means of which work was completed on entire mile and a half in 19 months, 7 months before date set by contract.
Construction methods on a triple sewer with a cross-section of 800 sq. ft., by means of which work was completed on entire mile and a half in 19 months, 7 months before date set by contract.
Construction of Connors creek sewer
Public Works
Ashley, Carl (Autor:in)
Public Works ; 54
1923
4 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of garrison creek sewer, Toronto
Engineering Index Backfile | 1916
Engineering Index Backfile | 1933
Rosedale creek sewer extension, Toronto
Engineering Index Backfile | 1919
Upgrading the Coal Creek Trunk Sewer
British Library Conference Proceedings | 2021
|