Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods employed on difficult road construction on Ozark trail highway in eastern Arkansas
Swampy soil makes work unusually difficult; dragline excavators make high fills; special attention to drainage.
Methods employed on difficult road construction on Ozark trail highway in eastern Arkansas
Swampy soil makes work unusually difficult; dragline excavators make high fills; special attention to drainage.
Methods employed on difficult road construction on Ozark trail highway in eastern Arkansas
Mun. County Eng
Fry, Albert S. (Autor:in)
1922
6 pages
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Research and Regulatory Water Quality Perspectives, Ozark Mountain Region, Arkansas
British Library Conference Proceedings | 2002
|Road and highway construction methods
Engineering Index Backfile | 1965
|