Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Railroad built along line from source of materials and then taken up as flume is built in reverse direction; 2 1/2-mi. conduit and flume line built by San Joaquin Light and Power Corpn., Cal.
Building a concrete flume in rough country
Eng. News-Rec
Fox, H.K. (Autor:in)
1923
2 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete slab flume construction
Engineering Index Backfile | 1913
|Flume Studies of Flow in Steep, Rough Channels
ASCE | 2021
|Flume studies of flow in steep, rough channels
Engineering Index Backfile | 1960
|Uniform Flow Development Length in a Rough Laboratory Flume
British Library Conference Proceedings | 2014
|Precast concrete slabs make durable flume
Engineering Index Backfile | 1918
|