Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tests on reinforced fused cement and method of calculation to be deduced
Describes rupture tests of 3 days, 3 months, 6 months, 1 year, 2 years, and 5 years, and gives comparative figures for earlier periods; pole, slab, and beam tests; conclusions as to Lafarge fused cement's superiority over ordinary portland cement. (See also - no. 6 Aug. 11 1923 pp. 126-130, no. 7 Aug 11 p 151-154)
Tests on reinforced fused cement and method of calculation to be deduced
Describes rupture tests of 3 days, 3 months, 6 months, 1 year, 2 years, and 5 years, and gives comparative figures for earlier periods; pole, slab, and beam tests; conclusions as to Lafarge fused cement's superiority over ordinary portland cement. (See also - no. 6 Aug. 11 1923 pp. 126-130, no. 7 Aug 11 p 151-154)
Tests on reinforced fused cement and method of calculation to be deduced
Essais de pieces en beton de ciment fondu arme , methode de calcul que l'on peut en deduire
Leflot, Georges (Autor:in)
Genie Civil ; 83
1923
6 pages
21 Figs.
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reinforced concrete and fused cement
Engineering Index Backfile | 1922
|Engineering Index Backfile | 1935
|Engineering Index Backfile | 1923
|Engineering Index Backfile | 1922
|Engineering Index Backfile | 1923
|