Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Digging the industrial canal at New Orleans
Work begun June 6, 1918, canal opened May 5, 1923. Cost about $ 20,000,000. The siphons, bridges, and locks.
Digging the industrial canal at New Orleans
Work begun June 6, 1918, canal opened May 5, 1923. Cost about $ 20,000,000. The siphons, bridges, and locks.
Digging the industrial canal at New Orleans
Contractors' Engrs. Monthly
1923
6 pages
4 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The New Orleans industrial canal
Engineering Index Backfile | 1918
|The New Orleans navigation canal
Engineering Index Backfile | 1922
|British Library Online Contents | 2008
|Design and Construction of Deep Mixing at Orleans Avenue Canal, New Orleans
British Library Conference Proceedings | 2013
|