Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Calumet-Sag navigation project
Improvements to Calumet-Sag Channel connecting Chicago Sanitary and Ship Canal and Calumet River have been completed; barge tows four times larger than present tows will be able to move freely through channel to connect with deep draft navigation at Lake Calumet; first phase of project consists of utility relocation, dredging, relocation of railway and highway bridges, and construction of navigation lock.
Calumet-Sag navigation project
Improvements to Calumet-Sag Channel connecting Chicago Sanitary and Ship Canal and Calumet River have been completed; barge tows four times larger than present tows will be able to move freely through channel to connect with deep draft navigation at Lake Calumet; first phase of project consists of utility relocation, dredging, relocation of railway and highway bridges, and construction of navigation lock.
Calumet-Sag navigation project
ASCE -- Proc (J Waterways Harbors Div)
Corey, Jr., J.B.W. (Autor:in)
1958
12 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Calumet River lock, Calumet-Sag Project, Illinois
Engineering Index Backfile | 1958
|Calumet Tunnel Project, A Case History
British Library Conference Proceedings | 1995
|Railroad bridge alterations, Calumet-Sag Project
Engineering Index Backfile | 1958
|Engineering Index Backfile | 1925
|Engineering Index Backfile | 1959
|