Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods of excavation and roof support used in some recently constructed tunnels
Correlation of information obtained during personal investigations at four rock tunnels, and information obtained from records and personal views of constructors of two other tunnels not visited during excavation phase of construction; Saltsburg tunnel (Pennsylvania Railroad); Baltimore and Ohio Railroad tunnel; East Branch tunnel; Penn-Lincoln Parkway tunnels; Youghiogheny tunnel; Crooked Creek tunnel.
Methods of excavation and roof support used in some recently constructed tunnels
Correlation of information obtained during personal investigations at four rock tunnels, and information obtained from records and personal views of constructors of two other tunnels not visited during excavation phase of construction; Saltsburg tunnel (Pennsylvania Railroad); Baltimore and Ohio Railroad tunnel; East Branch tunnel; Penn-Lincoln Parkway tunnels; Youghiogheny tunnel; Crooked Creek tunnel.
Methods of excavation and roof support used in some recently constructed tunnels
U S Bur Mines -- Information Cir
Polack, S.P. (Autor:in)
1950
14 pages
Supp plates
Report
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Europäisches Patentamt | 2016
|Engineering Index Backfile | 1952
|Methods of development of temporary roof supports used during driving of hydraulic tunnels
Engineering Index Backfile | 1966
|Excavation and support determination for the design and construction of tunnels
British Library Conference Proceedings | 2001
|