Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pictorial report on work including excavation 12 ft deep, pile driving 40 ft, mechanical equipment and repair of foundations of many buildings along route.
Pictorial report on work including excavation 12 ft deep, pile driving 40 ft, mechanical equipment and repair of foundations of many buildings along route.
Canada's first subway
Excavating Engr
Nesbitt, E.T. (Autor:in)
Excavating Engineer ; 44
1950
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Canada's first subway features easy transfer from surface transportation
Engineering Index Backfile | 1950
|Nearing Completion at Toronto [midline ellipsis] Canada's first subway
Engineering Index Backfile | 1953
Engineering Index Backfile | 1938
Canada's first floating bridge
Engineering Index Backfile | 1958
Engineering Index Backfile | 1940