Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Engineers build 500-mgd water system for Sunbury Steam Electric Station
Estimated requirements for ultimate rated capacity of 550,000 kw are 712 cfs for circulating condenser cooling water and 65 cfs for service water; total of 500 mgd must be taken from Susquehanna River; water supply system involved intake, circulating, discharge systems and construction of dam; precautions taken to prevent ice from interfering with plant operation.
Engineers build 500-mgd water system for Sunbury Steam Electric Station
Estimated requirements for ultimate rated capacity of 550,000 kw are 712 cfs for circulating condenser cooling water and 65 cfs for service water; total of 500 mgd must be taken from Susquehanna River; water supply system involved intake, circulating, discharge systems and construction of dam; precautions taken to prevent ice from interfering with plant operation.
Engineers build 500-mgd water system for Sunbury Steam Electric Station
Civ Eng (NY)
Seib, C.B. (Autor:in)
1950
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Display system, Sunbury, England
British Library Online Contents | 2005
|British Library Online Contents | 2004
|DESIGN REVIEW - Display system, Sunbury, England - SHOPKIT DESIGNS
Online Contents | 2005
Untersuchung eines Standard-Sunbury-Engine-Indikators
TIBKAT | 1938
|Stratton steam electric station
Engineering Index Backfile | 1959
|