Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Circulating water system and coal wharf at Brighton "B" Power Station
Circulating water facilities; all conduits are of reinforced concrete box section with exception of sea outfall, which is formed of large concrete pipes cast in mass concrete between sheet piled walls; wharf designed to take colliers of tonnages up to 4200, is 2000-ft long, of steel sheet piled construction with welded walings.
Circulating water system and coal wharf at Brighton "B" Power Station
Circulating water facilities; all conduits are of reinforced concrete box section with exception of sea outfall, which is formed of large concrete pipes cast in mass concrete between sheet piled walls; wharf designed to take colliers of tonnages up to 4200, is 2000-ft long, of steel sheet piled construction with welded walings.
Circulating water system and coal wharf at Brighton "B" Power Station
Engineer
Engineer ; 189
1950
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2000
|Engineering Index Backfile | 1949
Underground station, Canary Wharf, London
British Library Online Contents | 2000
|NORMAN FOSTER - Underground Station, Canary Wharf
Online Contents | 2000
Canary Wharf underground station in London
British Library Online Contents | 2001