Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Water intake for supply of condensation water to 400,000-kw steam electric station consists of 78-in. steel pipes and 42-in. warming line; ten 24-in. and two 30-in. pipe pile caissons support intake; pump well was built within dewatered, 97-ft circular sheet pile cofferdam; two reinforced concrete ring wales held it against 53-ft differential head; work stages illustrated.
Water intake for supply of condensation water to 400,000-kw steam electric station consists of 78-in. steel pipes and 42-in. warming line; ten 24-in. and two 30-in. pipe pile caissons support intake; pump well was built within dewatered, 97-ft circular sheet pile cofferdam; two reinforced concrete ring wales held it against 53-ft differential head; work stages illustrated.
Big intake built in flooded cofferdam
Construction Methods Equipment
Herlihy, J. (Autor:in)
1950
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Ship basins built in large cofferdam
Engineering Index Backfile | 1941
Big Cofferdam built in turbulent rapids
Engineering Index Backfile | 1948
Louisiana's first tunnel built in open Cofferdam
Engineering Index Backfile | 1955
|Building cellular wall cofferdam, St. Louis intake
Engineering Index Backfile | 1926
|Cofferdam 3,000 Ft. long built at grand coulee
Engineering Index Backfile | 1935