Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Solving Rio Grande silt problem
Report on $73,000,000 project designed to reverse tendency for aggradation of river bed and to eliminate flood threats; aim will be reached by earth fill dams; El Vado and Jemez River dams are 175 and 127 1/2 ft high, respectively; former produces 200,300, latter 120, 000 acre ft reservoir; Chamita dam, 205 ft high, forms reservoir of 687,700 acre ft capacity; data on silt control, dredging and effect on water supply.
Solving Rio Grande silt problem
Report on $73,000,000 project designed to reverse tendency for aggradation of river bed and to eliminate flood threats; aim will be reached by earth fill dams; El Vado and Jemez River dams are 175 and 127 1/2 ft high, respectively; former produces 200,300, latter 120, 000 acre ft reservoir; Chamita dam, 205 ft high, forms reservoir of 687,700 acre ft capacity; data on silt control, dredging and effect on water supply.
Solving Rio Grande silt problem
Western Construction
Western Construction ; 25
1950
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1935
|Engineering Index Backfile | 1934
|ASCE | 2021
|Closure of “Nickle on the Silt Problem”
ASCE | 2021
|Closure of “Stabler on the Silt Problem”
ASCE | 2021
|