Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Step-by-step tunnel construction keeps sewer capacity ahead of flow
Data on outfall facilities of Los Angeles County Sanitation Districts; first postwar addition involved 6 ft diam mile-long ocean outfall; next stop was 2 mi section of 6 mi long, 12 ft diam horseshoe tunnel; construction of further section followed; new tunnel and existent 8 ft diam tunnel were connected by means of chamber from which shaft was built into old tunnel.
Step-by-step tunnel construction keeps sewer capacity ahead of flow
Data on outfall facilities of Los Angeles County Sanitation Districts; first postwar addition involved 6 ft diam mile-long ocean outfall; next stop was 2 mi section of 6 mi long, 12 ft diam horseshoe tunnel; construction of further section followed; new tunnel and existent 8 ft diam tunnel were connected by means of chamber from which shaft was built into old tunnel.
Step-by-step tunnel construction keeps sewer capacity ahead of flow
Eng News-Rec
Engineering News-Record ; 144
1950
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Tunnel sewer construction facilitated by special pipe
Engineering Index Backfile | 1957
British Library Online Contents | 2003
Determining Rehabilitated Sewer Flow Capacity
British Library Conference Proceedings | 1996
|A Step Ahead: The construction of a prestressed ribbon bridge
British Library Online Contents | 1999
|