Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Manchester-Sheffield-wath railway electrification
Scheme involves 75 mi of route and track mileage of 330, new single line tunnel 330 yd long at Thurgoland, and new double line tunnel under Pennines between Woodhead and Dunford Bridge constructed; 1500-v overhead collecting equipment being installed by British Insulated Callender's Cables, Ltd; motive power provided by 85 mixed traffic locomotives. (see also Engineer v 189 n 4909 Feb 24 1950 p 248-50; Ry Gaz v 92 n 8 Feb 24 1950 p 232-3)
Manchester-Sheffield-wath railway electrification
Scheme involves 75 mi of route and track mileage of 330, new single line tunnel 330 yd long at Thurgoland, and new double line tunnel under Pennines between Woodhead and Dunford Bridge constructed; 1500-v overhead collecting equipment being installed by British Insulated Callender's Cables, Ltd; motive power provided by 85 mixed traffic locomotives. (see also Engineer v 189 n 4909 Feb 24 1950 p 248-50; Ry Gaz v 92 n 8 Feb 24 1950 p 232-3)
Manchester-Sheffield-wath railway electrification
Engineering
Engineering ; 169
1950
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Manchester-Sheffield-wath railway electrification
Engineering Index Backfile | 1950
Manchester-Sheffield-wath railway electrification
Engineering Index Backfile | 1950
Municipal works and statistics of wath-upon-dearne
Engineering Index Backfile | 1916
|