Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dam, description of intakes for navigation and industrial purposes, navigable canal of 17 km length, lock, 11-km long waste channel and nine bridges; plant will contain six groups of 50,000 kw each, consisting of Kaplan turbine connected to 10,500-v alternator; head varies from 16 to 26 m.
Dam, description of intakes for navigation and industrial purposes, navigable canal of 17 km length, lock, 11-km long waste channel and nine bridges; plant will contain six groups of 50,000 kw each, consisting of Kaplan turbine connected to 10,500-v alternator; head varies from 16 to 26 m.
Utilization of head of Donzere-Mondragon on Rhone River, France
Les travaux d'amenagement de la chute de Donze reMondragon, sur le Rhone
Gres, G. (Autor:in)
Genie Civil ; 127
1950
5 pages
Maps, Sectional drawings, Photographs
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Utilization of head of Donzere-Mondragon on Rhone river, France
Engineering Index Backfile | 1951
|Utilization of head of Donzere-Mondragon on Rhone river, France
Engineering Index Backfile | 1951
|Utilization of head of Donzere-Mondragon on Rhone River, France
Engineering Index Backfile | 1952
|Harnessing of Rhone River and construction of Donzere-Mondragon hydroelectric power plant
Engineering Index Backfile | 1949
|TGV Mediterranean HS train. The viaduct over the Rhone between Venejan and Mondragon
British Library Online Contents | 1999
|