Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Progress with new woodhead tunnel
Total length 3 mi 178 ft, with rising gradient of 1 in 130 from Manchester end for two thirds of length followed by falling gradient of 1 in 1186 for remaining third; full excavation size of tunnel, 31 ft wide by 24 ft high. (See also Engineering v 171 n 4457 June 29 1951 p 784-5; Ry Gaz v 94 n 26 June 29 1951 p 724-6)
Progress with new woodhead tunnel
Total length 3 mi 178 ft, with rising gradient of 1 in 130 from Manchester end for two thirds of length followed by falling gradient of 1 in 1186 for remaining third; full excavation size of tunnel, 31 ft wide by 24 ft high. (See also Engineering v 171 n 4457 June 29 1951 p 784-5; Ry Gaz v 94 n 26 June 29 1951 p 724-6)
Progress with new woodhead tunnel
Engineer
Engineer ; 191
1951
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Progress with new woodhead tunnel
Engineering Index Backfile | 1951
Progress with new woodhead tunnel
Engineering Index Backfile | 1951
Concrete quality control at Woodhead new tunnel
Engineering Index Backfile | 1954
|Woodhead new tunnel: Construction of three-mile main double-line railway tunnel
Engineering Index Backfile | 1954
|Woodhead new tunnel: Construction of three-mile main double-line railway tunnel
Engineering Index Backfile | 1954
|