Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Aberdeen main drainage: notes on details and construction
Following works have been completed: sewer tunnel varying from 7 ft 6 in. to 4 ft diam, sewers in open cut varying from 7 ft 6 in. diam downwards, ordinary manholes, special cascades, syphons including River Dee crossing, and overflow chambers; illustrated description of work. (See also - discussion p 324-5)
Aberdeen main drainage: notes on details and construction
Following works have been completed: sewer tunnel varying from 7 ft 6 in. to 4 ft diam, sewers in open cut varying from 7 ft 6 in. diam downwards, ordinary manholes, special cascades, syphons including River Dee crossing, and overflow chambers; illustrated description of work. (See also - discussion p 324-5)
Aberdeen main drainage: notes on details and construction
Instn Mun Engrs -- J
Mathieson, E. (Autor:in) / Laing, A.G. (Autor:in)
1950
27 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Aberdeen main-drainage works: Girdleness outfall scheme
Engineering Index Backfile | 1910
TIBKAT | 1991
|Notes on the design of main drainage schemes
Engineering Index Backfile | 1929
|MARINE CONSTRUCTION - Aberdeen Marine Operations Centre
Online Contents | 2007
|